One of our large projects in 2020/21 saw the team work away on this custom build which features a 15 metre underground tunnel connecting the garage to the house.


Initially this required us to lift, place and join 10 box culverts to form the tunnel which was our first time performing a task like this at that scale

 Stage 1 to Stage 4